The pit for the turntable has been cut with rough placement of the car shop, round house and engine house (left to right) Notice the water tower on the concrete pad in front of roundhouse! In the background to the right of the cream colored building with the green trim is the beginnings of Depot Park. Merchant's Row is taking shape below. The roadway has been laid from Center Street(on left) to Washington Street (on right). The sidewalks are in place in Depot Park as is the driveway which will be in front on the depot. Covered station platform is at the bottom between station track and the Main Line. The blue tape is seven layers thick with lightweight spackle used as the "concrete" sidewalk. After the spackle is dried and painted - the tape will be removed and then grass, trees, streetlights, benches and people will be added to the park. Main Line is along the front edge of the layout. The Depot is resting on the edge of the drop leaf yard while construction of Depot Park continues. The engine terminal leads are the curved tracks above the Depot. In this view from left to right are the sand house, diesel oil tank, ash conveyor, coal dock and then the engine house...... Mostly this picture is to show the yard in it's "down" position. My son says the down position will never be repeated as I really am most interested in working the yard. His take is that I will not want to remove all the cars and yard buildings to lower the yard unless it is for construction / maintenance. He is probably right!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment