The yard is coming together. There will be a couple more tracks for inbound / outbound trains as well as some sidings for industries and a van track to clean and store vans (cabooses in Rutland terminology) for their next assignment. There is a great deal of wiring under the table that needs to be connected. I have found a new method of connecting the track leads to the track bus but need to make a Radio Shack run to find the connectors - no more soldering! - I hope!
The crossover connectors leading to the yard are working well. They are 4" pieces of track that bridge the gap between the the main layout and the drop leaf yard. I soldered pieces of # 12 gauge wire to one end of the track so it "snaps" into place on the yard side. It also conducts the necessary power to keep the trains running. Gerry, the proprietor of my favorite hobby store, had told me of the technique so I gave it a try. I could not be happier with the results.
There will be pictures of the layout soon
No comments:
Post a Comment