Wednesday, July 4, 2007
Finally - Revenue Trains
Rutland-- On July 4, 2007 at 8:57 PM (by the Station clock) the New Rutland Railroad (or Railway - depending on the mood of the Blogger) officially saw two revenue trains travel the whole pike (20 feet or so) without stalling or derailing! It has been a long time coming. Thank goodness it rained and I am watching the Boston Pops Esplanade Orchestra performing and working on the railroad.
Sunday, June 10, 2007
Vt. State Fair, September 1952
World of Mirth train being unloaded down the "runs".
OK- so there is nothing that says "World of Mirth Shows!
It's a representation!!
There are Cole Brother"s flats, Pinder (Germany) trucks, a P.T.Barnum Shows trailer, a Reithoffer lighting truck, Royal American Shows cars, the "Wisconsin" - a restored Dining Car owned by the Circus World Museum in Baraboo, Wisconsin and a couple of flat cars restored by the Circus World Museum and used annually in the Great Circus Train that travels from Baraboo to Milwaukee. Each of the flats are painted for a different traveling railroad show of the 19th and 20th centuries in the United States of America.
The Midway train being switched in the Rutland yard.
World of Mirth train in the Rutland waiting to be off loaded. The train actually was unloaded south of the main yard onto Park St. and then the tractors and dozers pulled all the wagons and equipment across Park St. into the Fairgrounds. The kids who went to the Park St. Elementary School got an extra week's vacation each year as the school was across the street from the Fairgrounds.
OK- so there is nothing that says "World of Mirth Shows! It's a representation!!
There are Cole Brother"s flats, Pinder (Germany) trucks, a P.T.Barnum Shows trailer, a Reithoffer lighting truck, Royal American Shows cars, the "Wisconsin" - a restored Dining Car owned by the Circus World Museum in Baraboo, Wisconsin and a couple of flat cars restored by the Circus World Museum and used annually in the Great Circus Train that travels from Baraboo to Milwaukee. Each of the flats are painted for a different traveling railroad show of the 19th and 20th centuries in the United States of America.
The Midway train being switched in the Rutland yard.
World of Mirth train in the Rutland waiting to be off loaded. The train actually was unloaded south of the main yard onto Park St. and then the tractors and dozers pulled all the wagons and equipment across Park St. into the Fairgrounds. The kids who went to the Park St. Elementary School got an extra week's vacation each year as the school was across the street from the Fairgrounds.The dining car "Wisconsin" is behind the Ferris Wheel and Sea Dragon rides. A generator truck is behind the Sea Dragon supplying the necessary electricity to power all the lights, sights and rides of the Midway.
Also in the picture - the Thunder Bolt and a kiddie version of the Octopus on the left. In the center are food concessions. On the right are game concessions - I never won much on these! In the bottom right is a permanent concession operated by the Lion's Club (I think) each year.
So the "New Rutland" is not doing so well. Still cannot get the steamers to negotiate the curve coming in to Rutland. I just got #401 RS-1 equipped with LokSound! It is amazingly realistic sound. However it shorts out on every turnout so all in all things are not so good on the Rutland.
So the "New Rutland" is not doing so well. Still cannot get the steamers to negotiate the curve coming in to Rutland. I just got #401 RS-1 equipped with LokSound! It is amazingly realistic sound. However it shorts out on every turnout so all in all things are not so good on the Rutland.
I need to check the electrical pick-ups on the #401. It ran fine before I got the sound so I'm thinking there might be something there. I could also power all the tracks in each turnout but I'm not sure if that will make a difference. If anyone who reads this can offer suggestions or solutions I would be most thankful. Now on to some fun. I put together a diorama today of the Vt. State Fair held in Rutland each fall. It is a scene from the midway. I just took a picture of the diorama and added some photos from Layout #3 that I took of the midway unloading for the fair. The World of Mirth midway came to Rutland for many years. So here are my representations of the train, unloading and the Midway! Enjoy!
Sunday, May 6, 2007
New Station
Construction progresses.
Main line / passing siding / engine terminal lead. New station. note turnout at far end of station. it will be the Swift Meat, Diamond National Lumber siding. Curved black roadbed in upper right will be the yard leads. Be awhile before those tracks are laid. I have to get the Main working first. Probably will be tearing up a section of track and the two curved turnouts behind the Poland Springs bottle sinnce I cannot get any steam engines to stay on the rails in that section.
Friday, May 4, 2007
The "New" Rutland Layout - Conceptually
Today's version of the layout is as follows. Don't hold me to it 'cuz it changes frequently. The basics are as follows: It is October 1952 in Rutland Vt. The Rutland - MSJ game is four weeks in the future (Rutland will win. I should check this fact.) Anyway the air is crisp, clean and the sky is bright blue. The main layout is 4'x8' representation of Rutland Vermont downtown (as we called it). The Main runs along the front edge of the layout. The Station and passenger platforms are inside of the Main. To the left of the station will be the 90' turntable with the Boiler shop, Roundhouse and Coach / Car Repair shop situated around it. The lead from the station also has the ashpit, coal dock and water tower. There is a spur to the left also for the supply track (oil, sand, coal) and the diesel ready track. To the right of the station will be a spur with the Swift Premium meat plant, Diamond National Lumber (artistic license as Diamond was at the other end of town) and perhaps Duffy Coal (also at the other end of town in reality!). In the space directly behind the station is Depot Park, Merchants Row with the Service Building, the Bardwell Hotel and others whose names I cannot remember. To the right will be Washington St (30 degree angle to Merchants Row) with City Hall and it's park and the Fire Station. Center St. will be at the other end of Merchants Row. As for the railroad - it will travel in an oval around the 4x8 section for the time being. Let me say here that this layout is all about the main classification yard and shops in Rutland. The Main will leave Rutland to left going North and West and to the right going South and East. This part of the layout will be very similar to layout #3 - more detailed than #3 but very similar. I'll post a couple of photos of #3's downtown so you can imagine what the new one will look like.
The next installment will discuss the drop leaf yard and the North and South extensions.
The next installment will discuss the drop leaf yard and the North and South extensions.
Downtown Rutland Layout #3
Tuesday, May 1, 2007

Still the old pike. The new one is aggrevating me so I'm waxing nostalgic. This picture is of the shops area. It contains a bunch of stuff. starting on the right - water tower, coal dock with a load of coal in the Rutland hopper, a Mikado, the roundhouse (green doors), and the new boiler shop under construction, an RS-3 on the turntable, another in the boilershop, a red Rutland caboose in the tunnel and the marble company on the upper level. Last thing - that big lump on the flatcar on far left in front of the caboose - is an actual cinder that was used as ballast on the real Rutland Railroad.
Subscribe to:
Posts (Atom)


